HUAKONG | EXISTING-SYSTEM CHANGE CHECKLIST Blank planning aid; this is not an instruction to operate or overwrite equipment. 1. BASELINE Equipment / application: PLC and HMI model: Engineering-software versions: Available current source files and drawings: Who has permission to review and change the source: Backup / restoration responsibility: 2. REQUIRED CHANGE Current behaviour: Required new behaviour: Affected modes, parameters, sequences and screens: Third-party interfaces affected: Functions that must remain unchanged: 3. TEST CONDITIONS Checks possible without the installed machine: Hardware available for testing: Checks that require the actual installation: Authorised onsite operator / responsible person: Approved intervention window, where applicable: 4. AGREED DELIVERY Files, comments, tag lists and notes to deliver: Relevant runtime licences or third-party restrictions: Acceptance criteria for the new requirement: Regression checks for retained functions: Open observations and responsible parties: How later scope changes will be agreed: Do not enter passwords, network-access credentials or customer-confidential source code here. Share detailed files through an agreed channel. Completing this checklist does not send data or authorise any work on a live machine. Business contact: truongl153a8@gmail.com