PROJECT QUESTIONS
Clear answers before the work begins.
These answers help frame the discussion. The agreed quotation, scope and acceptance requirements define each individual project.
Can we commission only PLC or HMI programming?
Yes. The engineering scope can focus on software when suitable hardware, drawings and process requirements are available. The quotation should identify who provides hardware, testing and onsite commissioning.
Can you modify an existing machine program?
We first review the platform, accessible project files and the required changes. Existing functionality to preserve, backups and acceptance checks should be agreed before a modification is made.
Which automation platforms can you work with?
Our published examples include Mitsubishi FX5U and Siemens S7-200 SMART projects, together with HMI and supervisory interfaces. Send the exact controller, screen and software versions so that compatibility can be assessed.
Can the work be developed remotely?
Development and review can be organised remotely where the available files and test arrangements make that practical. Physical commissioning requires an authorised onsite person, agreed access and application-specific safety checks.
Are editable project files included?
Editable engineering projects, comments, tag lists and other documents should be specified in the quotation. Proprietary components, existing third-party programs and licence restrictions must be considered separately.
Are SCADA or HMI runtime licences included?
Do not assume they are. Engineering services, the generated project and commercial runtime licences are different items; the quotation should list what is and is not included.
What information is needed for an initial discussion?
A brief process description, equipment list, controller and screen models, available drawings, required functions and the desired schedule are a useful start. Share detailed files only through a mutually agreed channel.
Can you supply a control cabinet outside China?
A potential cabinet supply requires a review of destination requirements, electrical specifications, shipping, certification obligations and onsite responsibilities. No blanket export-compliance commitment is made on this website.
How are price and delivery time determined?
They depend on the scope, existing materials, I/O and device count, interface complexity, test conditions and commissioning responsibilities. A fixed price or schedule should follow a specific project review.
Can an existing PLC and HMI stay in place when SCADA is added?
That depends on the model, available communication interface, accessible point list and existing control responsibilities. We first identify the information that can be read and the commands that may be written. Changes to the PLC, a gateway or a different interface are assessed from that baseline, not assumed in advance.
Does a supervisory screen replace the PLC control program?
Not by default. The supervisory scope covers the agreed monitoring, operator commands and information presentation. The PLC or field system retains the control and interlock responsibilities defined for that application. The division must be recorded before interface development.
Is remote access included automatically?
No. Connectivity, user permissions, approval to operate equipment and the person responsible onsite need a separate agreement. A remote engineering session is not permission to bypass plant access controls or energise machinery without the authorised site team.
What happens when a third-party subsystem supplies only a point list?
We can define integration around that supplied interface, subject to compatibility review. The subsystem supplier remains responsible for the accuracy and availability of its points and its internal program unless that work is separately included. Read/write rights and a test contact should be agreed for each subsystem.
Can two machines share settings while keeping some parameters different?
A new project can be scoped around common and unit-specific parameters. The discussion should identify the source of truth, selected targets, permitted changes and confirmation behaviour. The published multi-station note illustrates a distribution relationship, not a ready-made parameter table to copy into another machine.
How are changes to the agreed scope handled?
Record the requested change, the affected hardware/software and the expected effect on acceptance tests, schedule and price. Confirm the revised responsibility and deliverable list before implementation. This avoids treating a new process requirement as an unbounded minor screen edit.
What should be agreed for acceptance testing?
Use a project-specific list covering operating modes, sequences, I/O and communication mapping, alarms, permitted commands and the deliverables being handed over. Separate tests possible with available hardware from checks that require the real installation and an authorised onsite operator.
Can the interface be organised around our equipment layout?
Yes, the page structure and equipment presentation can be discussed from process diagrams, layout drawings and reviewed visual material. Image preparation, three-dimensional visualisation and animation are separate scope items where required; useful operator information remains the priority.
Where should drawings and existing source projects be sent?
Begin with a short, non-confidential brief. Detailed drawings, backups and device information should be exchanged through a mutually agreed channel after access and scope are confirmed. The website does not accept attachments; never send account passwords or network access credentials in an initial inquiry.
START WITH THE REQUIREMENT
Tell us what your
equipment needs to do.
A process description and an equipment list are a useful starting point.